The Catchment.Ndlambe Municipality · REF T03-2627

Upgrading of Port Alfred Sewerage Infrastructure: Phase 2 Industrial Link

A listing tells you it exists. This tells you whether to chase it.

awaiting
score
value unknown
value band
closes 2d
closing
ConstructionPipelinesWTW / sewage

Extracted from source

Issuing entityNdlambe Municipality
ReferenceT03-2627
Value
ScopeInstallation of the 500mm diameter station hill bulk collector; bush clearing; dealing with existing sewer flows; tie into the Wharf Street pump station/600mm diameter bulk collector; installation of 160mm diameter waterborne sewer reticulation in industrial and residential areas; construction of sewer erf connections in industrial and residential areas; tie into the Station Hill Valley Bulk Collector; dealing with existing services; reinstatement of asphalt, paving and gravel roads after construction.
Service linesConstruction, Pipelines, WTW / sewage
CIDB required6CE
Closing04 Sept 2026 · closes 2d
Site visit07 Aug 2026compulsory
Province / municipalityEastern Cape · Ndlambe Local Municipality
B-BBEE
Local content
Fundingunknown
Duration
This gate opens with the group's grades
The reading engine has already extracted everything from the notice. Add the group's held CIDB designations on the Model screen and every tender scores instantly.

Where this came from

Ndlambe Notice 159-160 - 2026.pdf· National eTenders portalfirst seen 01 Sept 2026