The Catchment.Amatola Water · REF AW/2026/27/01

Term Contract Pre-Qualification of Civil Engineering Contractors for the Construction / Upgrade / Refurbishment / Remedial Works / Completion and Commissioning of Specific Water, Wastewater Treatment Plants, Water and Sewer Pipelines, Reservoir and Borehole Development Contracts within the Eastern Cape Province for a period of Thirty-Six (36) months

A listing tells you it exists. This tells you whether to chase it.

awaiting
score
value unknown
value band
closes 9d
closing
ConstructionPipelinesWTW / sewageMech / elecown revenue

Extracted from source

Issuing entityAmatola Water
ReferenceAW/2026/27/01
Value
ScopeAmatola Water is establishing five Term Contract Panels of pre-qualified civil engineering contractors (Category 1: All Civils - Panels A/B/C for 6CE/7CE/8CE+; Category 2: Borehole Development and Pipeline Reticulation - Panels D/E for 5CE/6CE+) to be used for future RFPs over a 36-month period for construction/upgrade/refurbishment/repair/maintenance/commissioning of water and wastewater treatment works, bulk water pipelines, pump stations, storage reservoirs and borehole development within the Eastern Cape. Pre-qualification is based on company experience (Portfolio of Evidence) and CIDB grading; pricing and key personnel evaluated later per project RFP.
Service linesConstruction, Pipelines, WTW / sewage, Mech / elec
CIDB required6CE + 7CE + 8CE + 5CE
Closing11 Sept 2026 · closes 9d
Site visit
Province / municipalityEastern Cape
B-BBEEBBBEE Verification Certificate required showing Ownership (Bo) details, valid within 12 months of tender closing, per Construction Sector Codes of Practice; consolidated certificate required for Joint Ventures or zero points applied
Local content
FundingAmatola Water (National Government business entity under PFMA Schedule 3B, reporting to Minister of Water and Sanitation via DWS) · own_revenue
Duration36 months
This gate opens with the group's grades
The reading engine has already extracted everything from the notice. Add the group's held CIDB designations on the Model screen and every tender scores instantly.

Where this came from

AW2026.27.01 Contract Prequalification Document for the Panel of Contractors. FINAL.pdf· National eTenders portalfirst seen 01 Sept 2026