Rates-Based Panel Contract for Maintenance Repairs to Roads and Stormwater Infrastructure to be used As-and-When-Required, for a period of 36 Months (CIDB Grades 4CE, 5CE and 6CE)
A listing tells you it exists. This tells you whether to chase it.
awaiting
score
value unknown
value band
closed
closing
ConstructionPipelinesNRW / meteringbudgeted grant
Extracted from source
Issuing entityeThekwini Municipality
Reference36458-1M
Value—
ScopeEstablishment of a panel of 18 contractors (CIDB Grades 4CE, 5CE and 6CE) to carry out as-and-when-required maintenance and repair works to roads and stormwater infrastructure across the eThekwini Municipality area over a 36-month period, via individual Work Package Orders. Works include upgrading of gravel to surfaced roads, provision of lanes/passages in informal areas, roadway/intersection improvements, pedestrian facilities, earthworks, layerworks (including asphalt), kerbing/channelling, drainage (V-drains, manholes), retaining structures, guardrails, road marking/signage, and other ancillary/emergency works.
Service linesConstruction, Pipelines, NRW / metering
CIDB required4CE + 5CE + 6CE
Closing21 Aug 2026 · closed
Site visit27 Jul 2026compulsory
Province / municipalityKwaZulu-Natal · eThekwini Metropolitan Municipality
B-BBEEPreference points claimed under Ownership Goal (Race: Black) and RDP Goal (South African owned enterprises), each weighted 50% of the 20 (80/20) or 10 (90/10) preference points. B-BBEE Status Level of Contribution Certificate required (MBD 6.1); Amended Construction Sector Code applies; EME/BEP thresholds specified for affidavit/CIPC certificate acceptance; Generic Codes certificates not accepted.
Local contentRDP Goal preference points awarded based on location: eThekwini Municipality (10 pts), KwaZulu-Natal (7 pts), South Africa (4 pts), Not in South Africa (0 pts) under the 80/20 system.
FundingMunicipal budget (MTREF - Medium Term Revenue and Expenditure Framework), subject to availability of funding/budget approval by eThekwini Municipality · budgeted_grant
Duration36 months
This gate opens with the group's grades
The reading engine has already extracted everything from the notice. Add the group's held CIDB designations on the Model screen and every tender scores instantly.