Appointment of a Service Provider for the Upgrade of Infrastructure at Mdala Nature Reserve – Phase 2: Construction of Bulk Water Pipeline
A listing tells you it exists. This tells you whether to chase it.
awaiting
score
R 1m–R 5m band
value band
closes 8d
closing
ConstructionPipelinesWTW / sewage
Extracted from source
Issuing entityMpumalanga Tourism and Parks Agency (MTPA)
ReferenceMTPA/20262027/PMU/03
ValueR 1m–R 5m band · est*
ScopeConstruction of approximately 3.6 km of DN100 Stainless Steel Grade 316L Schedule 80S bulk water rising main from the existing Picketts/Pickets Borehole Pump Station to the 16 m³ Chalet Reservoir at Mdala Nature Reserve, including all associated civil, structural, mechanical and ancillary works such as trench excavation, concrete thrust/anchor blocks, valve chambers, pipe support pedestals, installation of gate/air release/scour valves, dismantling joints, flanges, backfilling, pressure testing, flushing, disinfection and commissioning of the pipeline.
Service linesConstruction, Pipelines, WTW / sewage
CIDB required5ME + 5CE
Closing10 Sept 2026 · closes 8d
Site visit—
Province / municipalityMpumalanga · Mbombela
B-BBEEPreference points for Specific Goals (HDI 6, Youth 4, Gender/Women 5, Disability 5 under 80/20 system) claimed via SBD 6.1 Preference Points Claim Form; ownership status must be ≥50+1% on any specific goal to claim points.
Local content—
Fundingunknown
Duration6 months
* value not disclosed in notice · banded from scope by the reading engine
This gate opens with the group's grades
The reading engine has already extracted everything from the notice. Add the group's held CIDB designations on the Model screen and every tender scores instantly.